Main Projects

BV Neubau Zulassungsstelle Wiesbaden
New construction of the registration office in Wiesbaden...
Read More



BV DRK Seniorenzentrum – Wiesbaden Nordenstadt
Nursing places are created on Hainweg and ...
Read More

SAS Upgrade Ma’aden Aluminium – Ras Al-Khair
Complete Design, Commissioning of the new SCADA control center for Ma'aden - Aluminum
Read More
FDC‐ Field Data Collection Saudi Arabia
Main Target of PDMS Project was establishing comprehensive Enterprise Protection Information System (EPIS) across NG Saudi Arabia.
Read MoreReference List
Date | Project name | Services | Description | Equipment |
---|---|---|---|---|
2023-2024 | BV Neubau Zulassungsstelle Wiesbaden | Elektroinstallation für: | - Starkstromanlagen -Schwachstromanlagen | |
2023-2024 | BV DRK Seniorenzentrum - Wiesbaden Nordenstadt | Elektroinstallation für: | - Starkstromanlagen -Schwachstromanlagen | |
2023-2024 | BV STAU Kelsterbach | Elektroinstallation für: | - Starkstromanlagen -Schwachstromanlagen | |
2023-2024 | BV Stegstraße Ginsheim-Gustavsburg | Elektroinstallation für: | - Starkstromanlagen -Schwachstromanlagen | |
2023-2024 | BV Mathilde Wiesbaden | Elektroinstallation für: | - Starkstromanlagen -Schwachstromanlagen | |
2023 | BV LSA 1 Wiesbaden | Elektroinstallation für: | - Starkstromanlagen -Schwachstromanlagen | |
2023-2024 | BV Mainz Kostheim Am Sägewerk 4 | Elektroinstallation für: | - Starkstromanlagen -Schwachstromanlagen | |
2023-2024 | BV DotzheimerStr. Wiesbaden - ENESKA | Elektroinstallation für: | - Starkstromanlagen -Schwachstromanlagen | |
2023-2024 | BV Waldgärten Darmstadt | Elektroinstallation für: | - Starkstromanlagen -Schwachstromanlagen | |
2023-2024 | BV Mathilde Wiesbaden | Elektroinstallation für: | - Starkstromanlagen -Schwachstromanlagen | |
2022-2023 | BV Schönau-Quartier Wiesbaden | Elektroinstallation für: | - Starkstromanlagen -Schwachstromanlagen | |
2021-2022 | BV EO Bad Homburg | Elektroinstallation für: | - Starkstromanlagen -Schwachstromanlagen | |
2021-2022 | BV Hahner Mitte – Taunusstein | Elektroinstallation für: | - Starkstromanlagen -Schwachstromanlagen | |
2021-2022 | BV Quartier Kaiserhof -Wiesbaden | Elektroinstallation für: | - Starkstromanlagen -Schwachstromanlagen | |
2021-2022 | BV HSK Wiesbaden | Elektroinstallation für: | - Starkstromanlagen -Schwachstromanlagen | |
2021-2022 | BV Rowg Kriftel | Elektroinstallation für: | - Starkstromanlagen -Schwachstromanlagen | |
2021-2022 | BV Spinelli Mennheim | Elektroinstallation für: | - Starkstromanlagen -Schwachstromanlagen | |
2020-2022 | BV Senior Wohnen Advita BAd Windsheim | Elektroinstallation für: | - Starkstromanlagen -Schwachstromanlagen | |
2020-2021 | BV Zebra - Frankfurt | Elektroinstallation für: | - Starkstromanlagen -Schwachstromanlagen | |
2020-2021 | BV Postareal Lörrach | Elektroinstallation für: | - Starkstromanlagen -Schwachstromanlagen | |
2020-2021 | BV Heimatufer Ludwigshafen | Elektroinstallation für: | - Starkstromanlagen -Schwachstromanlagen | |
2020-2021 | Am Gänsberg Ingelheim | Elektroinstallation für: | - Starkstromanlagen -Schwachstromanlagen | |
2014-2015 | Reconstruction of substation 400/110 kV Bitola2, N Macedonia | Electrical engineering and Automation Design | -Design, configuration, P2P testing and commissioning of SCADA system, -Two SCADA application on one server, Remote connection to SCADA application -COM500 configuration -Configuration of ABB REC670 -Wiring checking in protection panels -Goose Messages -Checking interlocks on Busbar system(Earthswitch and Disconnector) | ABB Micro SCADA 9.3, ABB REC670, ABB REF670, ABB REL670, ABB REB670, ABB REF600, RUGGEDCOM RSG2100 i RUGGEDCOM ROUTER |
2014-2015 | Gas Power Plant Labreg, Algeria | Electrical engineering and Automation | -Configuration, P2P testing and commissioning of Siemens SCADA system -Configuration and commissioning of protection relays | Siemens Sicam PAS 6.0 i Win CC 7.0 |
2019 | BV Bildungscampus III Heilbronn, | Elektroinstallation für: | - Starkstromanlagen -Schwachstromanlagen | |
2019 | BV CureVac Tübingen, | Elektroinstallation für: | - Starkstromanlagen -Schwachstromanlagen | |
2018 | SS 13M 115kV, SS10J 115kV and SS131, SS132 33kV (cca. 140 mil USD) | Electrical engineering and Automation Design | -Project management and Financial management | Siemens and ABB equipment |
2017 | Upgrade of SCADA system in Hadeed Iron and steel, KSA | Electrical engineering and Automation | -Configuration, P2P testing and commissioning of Siemens SCADA system -Configuration and commissioning of protection relays -Sinaut LSA configuration | Siemens SICAM PAS 6.0 and WIN CC 6.0, Siprotec 4, Siemens Sinaut LSA |
2017 | Consultancy to perform the RCA (root cause analysis) for CB (circuit breaker 220 kV) flashover | Consultancy | -Project management and Financial management - -RCA,Consultancy | N/A |
2017 | SAS system upgrade in Dispatch Center,Maaden Aluminum Smelter, Jubail, KSA | Electrical engineering and Automation Design | -Project management and Financial management - Instllation, configuration and comissioning | ProzaNET, Ruggedcom, ABB REF600. ABB REF541, Schneider MiCOM, Schneider SCADA |
2016 | Advanced protection data management system with field data collection in real time, Asset Management, KSA (cca. 30 mil USD) | Electrical engineering and Automation | -Field data collection in real time from almost 900 HV substation -Project management and Financial management -Management for 7 IPS teams (30-35 engineers) -Work organisation for all member of 7 Teams -Organization for all members of 7 Teams for Accommodation, transportation, site permit, site visit | IPS CLOUD, IPS EPIS, IPS; ENERGY, Experience in work with 983 different type of relays (ABB, Siemens, Schneider, Toshiba, Mitsubishi, Alstom, GEC, GE, etc..) |
2016 | Reconstruction of 400 kV substation Ferizaj 2, Kosovo | Electrical engineering and Automation | -Configuration, P2P testing and commissioning of Siemens SCADA system -Configuration of protection relays | Siemens Sicam PAS 8.0 i Win CC 8.0, Siprotec 4 |
2015 | RTU In ADRAR, ALGERIA | Electrical engineering and Automation | -Configuration of RTU in Three substations, P2P testing and commissioning | ABB RTU560, RuggedcomRS2100, REF600, Rex670 |
2015 | SCADA system in Al Baha, KSA | Electrical engineering and Automation | Configuration of SCADA system | ABB Micro SCADA |
2015 | Gas Power Plant Sousse D, Tunisia | Electrical engineering and Automation | -Configuration, P2P testing and commissioning of Siemens SCADA system -Configuration and commissioning of protection relays | Siemens Sicam PAS 8.0 i Win CC 8.0, Siprotec 4 |
2014 | Reconstruction of SCADA system in Dispatch Center ED Zenica | Electrical engineering and Automation | -Upgrade of SCADA in Dispatch center from v8.6.5 to v9.3 -Upgrade and configuration of Siemens RTU-s (TM1703) in 6 substations -Upgrade and configuration of ABB RTU-s(RTU560 and COM600) in 7 substations | ABB Micro SCADA 9.3, ABB REF600, RUGGEDCOM, SIEMENS RTU TM1703, ABB COM600, ABB RTU560 |
2013 | ABB RTU560 Sarajevo | Electrical engineering and Automation Design | -Configuration of RTU -P2P testing and commissioning -Cable laying, Wiring testing -Design, As Built | ABB RTU560 |
2012 | El Merk Algeria -ABB Italy | Electrical engineering and Automation Design | -Design and configuration of HMI - Point2Point testing and commissioning | ABB RTU560 |