BV STAU -Kelsterbach

3 multi-storey residential buildings with a total of 63 apartments are being built along Staudenring and Berliner Straße.

Project start for Elektro: Mai 2023

Planned completion: Mai 2024

Project description

Electrical installation for:

Power installations :

  • distributions,
  • power cables,
  • emergency lighting,
  • routes, channels, floor tanks,
  • main and control cables,
  • installation equipment,
  • equipotential bonding,
  • interior lighting,
  • exterior lighting

Low power installation:

  • fire alarm system,
  • cabling weak current,
  • antenna system,
  • EDV / TK network,
  • ELA system