BV STAU -Kelsterbach
3 multi-storey residential buildings with a total of 63 apartments are being built along Staudenring and Berliner Straße.
Project start for Elektro: Mai 2023
Planned completion: Mai 2024
Project description
Electrical installation for:
Power installations :
- distributions,
- power cables,
- emergency lighting,
- routes, channels, floor tanks,
- main and control cables,
- installation equipment,
- equipotential bonding,
- interior lighting,
- exterior lighting
Low power installation:
- fire alarm system,
- cabling weak current,
- antenna system,
- EDV / TK network,
- ELA system